Timber cladding treatment · UK-wide

Fire retardant treatment for timber cladding

We apply fire retardant impregnation treatment to raw, untreated timber cladding on site across the UK. Your BS EN 13501-1 B-s2,d0 treatment certificate is supplied after completion and payment.

  • ✓ Raw, untreated timber
  • ✓ UK-wide on-site service
  • ✓ B-s2,d0 certification
Raw timber only

Untreated and absorbent

Euroclass B-s2,d0

BS EN 13501-1 classification

UK-wide treatment

Completed on site

Treatment certificate

Supplied after completion and payment

Timber suitability

Can your timber absorb the treatment?

We can treat raw, untreated timber that can absorb the impregnation product. Painted, varnished, oiled, stained or sealed surfaces cannot be treated with this system.

✓ Can be treated

Raw, untreated timber

  • Bare internal timber cladding
  • Bare external timber cladding
  • Existing bare cladding
  • Loose boards before installation, where approved
× Not suitable for this service

Finished or sealed timber

  • Painted timber
  • Varnished or lacquered timber
  • Oiled, stained or water-repellent surfaces
  • Any finish that prevents consistent absorption
Unsure about the finish?

Send the timber specification and details of any product previously applied. We will tell you whether an impregnation treatment is possible.

Understanding the classification

Understanding B-s2,d0

BS EN 13501-1 describes how the treated timber reacts when exposed to fire.

It is a reaction-to-fire classification, not a 30- or 60-minute fire-resistance rating for a wall or structural assembly.

See what replaced the legacy Class 0 classification →

Understand 30- and 60-minute timber protection →

BLimited contribution to fire
s2Smoke production classification
d0No flaming droplets or particles
On-site impregnation treatment in progress

Treatment options

Installed cladding or timber awaiting installation

Installed claddingMost of our work involves raw timber cladding that is already in place. We apply the measured impregnation treatment on site.
New-build projectsWe can treat loose timber at the client’s site before installation where the proposed system has been accepted by the project specifier. We do not provide factory pressure treatment.

A straightforward service

From timber details to certification

  1. 01
    Send the timber details

    Tell us the timber type, approximate area, whether it is raw and untreated, and the site address.

  2. 02
    Receive your quote

    We confirm suitability, price and treatment arrangements.

  3. 03
    We complete the treatment

    The impregnation treatment is applied consistently to the agreed timber area.

  4. 04
    Receive your certification

    Your BS EN 13501-1 B-s2,d0 documentation and treatment certificate are supplied after completion and payment.

Raw timber boards prepared for fire retardant impregnation treatmentSuitable raw timber prepared for treatment

Documentation

Your B-s2,d0 treatment documents

You receive the supporting documents needed for your project records.

01Manufacturer’s classification

The BS EN 13501-1 B-s2,d0 classification and its conditions.

02Treatment certificate

Confirmation of the site, timber, product and completed treatment.

Your quotation

What to send for a quote

Send the following details and we’ll confirm suitability and prepare an individual quotation.

  • Timber species or product details, if known
  • Confirmation that it is raw and untreated
  • Approximate square metres and faces requiring treatment
  • Whether it is installed or awaiting installation
  • Site address including postcode
  • Plans or photographs if helpful

Upgrading existing timber cladding

The Roundhouse, Newark-on-Trent

Fifteen-year-old Thermowood cladding required a Euroclass B upgrade following a property survey. We completed the specified treatment on site using high-level access equipment.

Read the project
15 yearsExisting cladding upgraded retrospectivelyCherry pickerHigh-level treatment completed at an occupied property

Common questions

Timber cladding treatment FAQs

For advice about your timber, send us the material and finish details.

View all FAQs →
What timber can you treat?

We treat raw, untreated timber that can absorb the impregnation product, including internal and external timber cladding.

Can you treat painted, varnished or sealed timber?

No. Paint, varnish, oil, stain and other sealers prevent the impregnation product from being absorbed consistently.

Does this provide 30 or 60 minutes of fire protection?

No. This service concerns reaction-to-fire classification under BS EN 13501-1 and does not provide a 30- or 60-minute fire-resistance rating for a structural element or construction.

What documentation will we receive?

We provide the manufacturer’s BS EN 13501-1 B-s2,d0 classification documentation and our Certificate of Fire Retardant Treatment.

Timber treatment and certification

Tell us about your timber

Send the timber details, approximate area and site address. We’ll confirm suitability and provide a clear quotation.

Get a free quote
Call nowGet a quote