Case study

Upgrading External Timber Cladding to Class B-s2,d0 at the Roundhouse

Fire Proofing Ltd was contacted by a client representing the building to upgrade its external timber cladding to BS EN 13501-1 Class B-s2,d0.

Technician treating external timber cladding from a mobile elevating work platform
External timber cladding treated from a mobile elevating work platform during the Roundhouse project.

Fire Proofing Ltd was contacted by a client representing the building to upgrade its external timber cladding to BS EN 13501-1 Class B-s2,d0.

Supporting apartment sales and mortgage applications

Apartment owners were experiencing difficulties selling their properties because potential buyers could not obtain mortgage approval with the existing cladding information.

The client therefore needed the building’s external timber cladding upgraded to Class B-s2,d0 with supporting treatment documentation.

Confirming the construction behind the cladding

Before treatment could be arranged, we needed to establish whether intumescent fire barriers had been installed behind the timber cladding during construction.

The client organised an inspection in which sections of the cladding were removed. This confirmed that the required barriers were present, allowing the external treatment programme to proceed.

Planning access to the complete building

The timber cladding extended to a height of approximately 15 metres, so safe access was an important part of the project.

A cherry picker was hired and delivered to the site. With IPAF 3a and 3b qualifications, we were able to operate the access equipment and complete the high-level treatment without requiring a separate access contractor.

Coordinating the work with residents

Residents were advised before treatment began so the external areas could be kept clear.

Cars were moved away from the building, and residents remained inside while the treatment was applied around their balconies. This protected people, vehicles and nearby property while allowing each section of cladding to be reached safely.

Applying the fire-retardant treatment

We worked progressively around the building, using the cherry picker and professional extension poles to apply the treatment across the external timber cladding.

The access equipment made it possible to reach the upper sections, balcony areas and other parts of the façade while maintaining consistent application.

Class B-s2,d0 treatment documentation

The completed timber treatment was documented to BS EN 13501-1 Class B-s2,d0.

The treatment certificate recorded:

  • The building and external timber cladding treated
  • The treatment product used
  • The completed Class B-s2,d0 treatment
  • The date of treatment
  • Maintenance and retreatment information

A coordinated solution for an occupied building

This project required more than applying a fire-retardant product. The construction behind the cladding first had to be confirmed, specialist high-level access arranged and the work coordinated around residents, vehicles and private balconies.

Careful preparation allowed the external timber cladding to be treated efficiently while the building remained occupied.

Read about fire-retardant treatment for timber cladding →

Timber cladding treatment

Need external timber cladding treated?

Read about professional fire-retardant treatment and Class B-s2,d0 certification for timber cladding.

View timber cladding treatment
Call nowGet a quote